Main image
12th February
2010
written by Richard Deaver

Now that we’ve had a break from the rain, I was able to take a few photos that show the progress on The Fultonia and have also included some “before” photos that show how this redevelopment project is progressing and the major changes that have occurred.

Anyone who is familiar with The Fultonia probably remembers the squalid conditions the residents were living in under the previous owner. Seeing the “before” condition of these units in person certainly tell the story better than photos, but needless to say, this property was in very, very poor condition.

Fortunately, the new owner, TFS Investments, LLC in a public-private partnership with the Fresno Redevelopment Agency has made a significant investment in The Fultonia and once completed, this complex will be filled with new residents that never would have considered this as a place to call home.

Sandra Kaye with Your Home Remodeling and Design has completed the decorating of three units that will serve as models. Sandra and her husband Tom have been remodeling and decorating homes in the Fresno area for over twenty years and has access to any type of furnishing and accessory available. They can be reached at (559) 277-1234.

The owner will also be offering new residents the opportunity to rent-to-own furnishings similar to how the models are furnished. There are four different studio floor plans to choose from and three separate one-bedroom plans new residents can select. The one-bedroom units on the ground floor will also have private patios accessible through a French door in the bedroom.

Design work has also started on the new coffee shop and casual dining restaurant and planning is still ongoing for the Laundromat and the remaining commercial storefronts. Both the coffee shop and restaurant will feature outdoor seating areas to take advantage of the moderate weather we enjoy in the Central Valley.

The neon Fultonia sign that hasn’t worked in years is also being restored by A-Plus Signs and should be installed soon.

The residential units should be available for occupancy soon and we will update this blog at that time so potential residents can select their new home. Every unit has been completely updated with new kitchens and baths featuring granite countertops, oak cabinets and wood laminate flooring and they will also come with new ranges and refrigerators installed.

I think the most exciting thing about this project is the positive impact to this area of the Tower District that we have designated as SoTow, or South Tower and are looking forward to seeing other properties in the vicinity take steps to continue the transformation of the neighborhood.

Stay tuned.

Leave a Reply

You must be logged in to post a comment.

Spam Protection by WP-SpamFree